Installing curtain walls in high-rise buildings involves an elaborate installation process designed to ensure the safety, efficiency, and structural integrity of both the curtain wall system and the building itself. Often this involves using low-cost factory environments for initial assembly of curtain wall modules (CWMs). Once preassembled these modules undergo an on-site installation procedure which tends to be faster and less labor-intensive than traditional methods of wall construction.

Installation processes for high-rise buildings typically consist of transporting, storing, and handling curtain wall elements with care to avoid damage. Anchorage and connection provisions are key in ensuring stability and safety once installed; detailed planning must be conducted for every high-rise structure according to their unique requirements; finally, the final fixing and inspection takes place so all architectural and structural standards have been met.
Curtain walls for high-rise buildings must be designed to be both lightweight and sturdy, made from materials such as glass, metal, or composite panels that support their own weight without adding additional burden to the building structure. They should also resist air and water infiltration while withstanding various weather conditions to increase energy efficiency and increase the aesthetic appeal of a building.